Grid Glossary

TRENDING TERM

Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

TRENDING TERM

Effective Load Carrying Capability (ELCC)

Measurement used to calculate how much an energy resource–such as a wind farm or solar array–contributes to the overall reliability of the grid. It assesses the resource’s ability to meet electricity demand, particularly during peak usage periods, and is especially useful for variable renewable energy sources whose output depends on factors like weather conditions. 

TRENDING TERM

Disturbance

Refers to any unwanted or unplanned electrical event that interferes with the normal operation of the electrical grid. These can manifest in power outages, surges, and other events, and can originate from various sources within the electrical grid, such as loss of a large generating unit or another grid asset, such as a transmission line or transformer.

Can’t find the term you’re looking for? Submit it here!

CAISO

California ISO

Capacity

The maximum amount of power an energy source can physically produce (measured in megawatts/MW), or when referring to an electrical grid, the total amount of electricity that power plants connected to the grid are capable of producing. It’s essentially the total potential output of all the electricity sources, like coal, nuclear, hydro, wind, and solar plants. Meanwhile, energy is the actual output of a source over a particular time period. 

  • Capacity accreditation – The process by which grid operators determine the reliability contribution of individual power resources (such as power plants or energy storage systems) to the overall electricity grid. It quantifies how much a resource can reliably contribute to meeting demand, especially during peak times or periods of tight supply, guiding investment decisions for grid stability.
  • Capacity auction – A competitive market mechanism where grid operators or utilities purchase energy in the market from electricity generators (such as coal plants, wind, and solar farms) or demand-response participants for future energy needs. Essentially, the generators or demand-response entities provide their energy or technology for future periods of high demand. Capacity market auctions ensure enough electricity is available for future demand at the lowest achievable price for consumers. The goal is to balance reliability with cost by having market participants compete. There are two main types of auctions:
    • Forward capacity auctions: held years before the capacity is needed, giving operators time to upgrade or build facilities. 
    • Incremental auctions: take place closer to the delivery time, adjusting for changes in demand or unexpected generator issues.  

Generally, participants submit sealed bids to offer capacity at specific prices. The auction ends when the total capacity offered matches the region’s needs, and a single clearing price is set for all commitments.  

  • Capacity costs – The charges associated with ensuring a sufficient supply of power to meet peak demand. These charges cover the cost of maintaining and operating power plants, transmission infrastructure, and other components needed to meet the highest levels of electricity usage, essentially guaranteeing power is available when it’s most needed.
  • Capacity market – A type of wholesale market designed to ensure there will be enough power generation available in the future to meet peak demand and maintain grid reliability. Generators receive payments for promising to be available to produce electricity when needed, even if they aren’t running all the time. Functions sort of like an insurance policy, in that generators are paid for the promise to show up with power during times of high demand. This type of market is a method to maintain resource adequacy. Not all markets use this method (example: Electric Reliability Council of Texas (ERCOT).
Clean firm energy

An energy source that generates electricity with zero- or extremely low-carbon emissions, and can do so when needed, regardless of weather conditions. They include enhanced geothermal energy and advanced nuclear technologies. They also can include solar or wind paired with battery storage to provide on-demand power supply regardless of weather conditions or time of day. 

Connect and manage

Refers to a regulatory approach for connecting new power generators to the electrical grid, notably used in Texas (ERCOT). This approach allows new generators to connect expeditiously with minimal upfront transmission upgrades. However, the grid operator retains the right to curtail their output if transmission constraints arise. This contrasts with approaches where developers pay for upgrades prior to connection. (see Energy-only interconnection approaches)

Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.