The minimum amount of electricity that a utility must provide to meet the consistent, ongoing needs of its customers. Historically, this steady demand was met by large power plants (like coal or nuclear) that ran continuously. Today, with more renewable energy, this minimum demand can be met by a flexible mix of various power sources, rather than relying solely on specific “baseload plants”.
A technology that stores electrical energy in rechargeable batteries for later use. Batteries help stabilize the grid, manage energy demand, and increase the use of renewable energy.
Any energy resource that provides energy directly to a home or business without passing through a utility company’s meter. Examples include rooftop solar and microgrids.
California ISO
The maximum amount of power an energy source can physically produce (measured in megawatts/MW), or when referring to an electrical grid, the total amount of electricity that power plants connected to the grid are capable of producing. It’s essentially the total potential output of all the electricity sources, like coal, nuclear, hydro, wind, and solar plants. Meanwhile, energy is the actual output of a source over a particular time period.
Generally, participants submit sealed bids to offer capacity at specific prices. The auction ends when the total capacity offered matches the region’s needs, and a single clearing price is set for all commitments.
An energy source that generates electricity with zero- or extremely low-carbon emissions, and can do so when needed, regardless of weather conditions. They include enhanced geothermal energy and advanced nuclear technologies. They also can include solar or wind paired with battery storage to provide on-demand power supply regardless of weather conditions or time of day.
Refers to a regulatory approach for connecting new power generators to the electrical grid, notably used in Texas (ERCOT). This approach allows new generators to connect expeditiously with minimal upfront transmission upgrades. However, the grid operator retains the right to curtail their output if transmission constraints arise. This contrasts with approaches where developers pay for upgrades prior to connection. (see Energy-only interconnection approaches)
An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).
An independent agency that regulates the interstate transmission of natural gas, oil, and electricity. FERC also regulates natural gas and hydropower projects.
A United States law primarily regulating the interstate transmission and sale of electricity and the development of hydroelectric power. It was responsible for creating the body now known as FERC. It was created in 1920 and has been amended several times since.
Measures taken to ensure backup power, particularly of renewable energy, such as solar and wind generators. These requirements may require battery storage, ancillary services, or backup generation, such as an added gas plant to produce energy when a solar or wind plant does not.
Electricity is supplied to homes and businesses in the United States in the form of alternating current, and frequency is the rate at which an alternating current changes direction, as measured in hertz (Hz). Across the power grid there is a consistent frequency which in the United States is 60 Hz.
The ability of the grid to react to a change in
the frequency to bring it back to the normal operating frequency, which is 60 Hz in the United States
Power that does not perform useful work but is used to establish and maintain electromagnetic fields that are needed to generate, transmit, and convert electric power in the alternating current network. A shortage of reactive power can cause voltage to decline. (See also: voltage support)
A characteristic of the whole electricity system to describe its ability to consistently deliver electricity to consumers without interruption, even through grid disturbances. Reliability comes down to having sufficient generating resources to meet demand and a functional operational grid system.
An agreement initiated by an RTO or ISO with a power plant, keeping it in operation temporarily for reliability purposes.
The ability of the grid to ride through extreme events, recover quickly, and support other critical systems (e.g., transportation, health care, public safety etc.).
An assessment of whether the current or projected resource mix is sufficient to meet capacity and energy needs for a particular grid. The resource mix includes all resources able to provide capacity and energy to the system. Adequacy assessments are used to identify potential shortfalls in the availability of resources across different time frames; from long-term planning (5 to 20+ years) to seasonal and day-ahead assessments.
(see also: ISO) – A non-profit organization that manages the electricity transmission system in a specific region, ensuring reliable and efficient electricity delivery. RTOs operate the high-voltage electricity grid, facilitating the movement of power from generating plants to substations and ultimately to consumers. They also oversee competitive wholesale electricity markets.