TRENDING TERM

Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

TRENDING TERM

Effective Load Carrying Capability (ELCC)

Measurement used to calculate how much an energy resource–such as a wind farm or solar array–contributes to the overall reliability of the grid. It assesses the resource’s ability to meet electricity demand, particularly during peak usage periods, and is especially useful for variable renewable energy sources whose output depends on factors like weather conditions. 

TRENDING TERM

Disturbance

Refers to any unwanted or unplanned electrical event that interferes with the normal operation of the electrical grid. These can manifest in power outages, surges, and other events, and can originate from various sources within the electrical grid, such as loss of a large generating unit or another grid asset, such as a transmission line or transformer.

Can’t find the term you’re looking for? Submit it here!

202(c) Order

An emergency order issued by the United States Department of Energy (DOE) under Section 202(c) of the Federal Power Act. It allows the Secretary of Energy to temporarily order connections of facilities and the generation, delivery, or transmission of electricity to best meet an emergency caused by war, a sudden increase in demand, or a shortage of energy or facilities. These temporary orders can also exempt power plants from federal, state, or local environmental rules and have historically been used to prevent outages during severe weather events or supply shortfalls.

National Association of Regulatory Utility Commissioners (NARUC)

A non-profit organization that represents state public service commissions, which regulate essential utility services like energy, telecommunications, and water. Its stated aim is to improve the quality and effectiveness of public utility regulation. It has eight committees:

  1. Consumer Affairs
  2. Critical Infrastructure
  3. Electricity
  4. Energy Resources & Environment
  5. Gas
  6. International Relations
  7. Telecommunications
  8. Water

It also has a task force focused on Innovation.

NERC

Non-profit organization that operates to assure the effective and efficient reduction of risks to the reliability and security of the grid. It oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California. Its responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events and produces reports about the near and long-term reliability forecast.

Notice of Proposed Rulemaking (NOPR)

A document used by government agencies to announce a potential new rule or amendment to an existing one. This is an official part of the law-making process, allowing public comment before the rule is finalized. The acronym is frequently used by the Federal Energy Regulatory Commission (FERC).

NREL

A government-owned, contractor-operated facility, funded and overseen by the United States Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE). It specializes in the research and development of renewable energy, energy efficiency, energy systems integration, and sustainable transportation.

NYISO

New York ISO

Peak demand

The brief periods when electricity consumption is at its highest, often driven by factors like extreme weather or heat events. This is the highest amount of electricity demand for which a grid operator needs to plan.

Peaker Plant

A power plant that is designed to quickly ramp up and provide electricity during periods of high energy demand, such as during hot summer afternoons or cold winter evenings, to meet the increased needs of households and businesses. These plants generally only run during these peak events to supplement regular power generation. 

Performance incentive mechanisms

A regulatory tool that ties a portion of utilities’ earnings to the utilities’ performance on desired regulatory outcomes, offering utilities opportunities to create the programs and services needed to advance emerging priorities.

Photovoltaic

The conversion of light into electricity at the junction of two substances exposed to light. A photovoltaic system employs solar modules, each comprising a number of solar cells, which generate electrical power.

PJM

Pennsylvania-New Jersey-Maryland Interconnection- services 13 states in Midatlantic and Midwest region

Power

The rate of transfer of energy. It’s essentially how quickly energy is being used or converted from one form to another in an electrical circuit. Power is measured in watts (W), which represents one joule (J) of energy per second.

Power Factor

A measure of how efficiently electrical power is being used. It shows how much of the total power flowing in a circuit is actually doing useful work (active power) versus being ”wasted” as reactive power. A power factor closer to 1 means higher efficiency and fewer losses.

PUC

Sometimes also called a Public Service Commission (PSC), is a state-level governmental agency that regulates utilities like electricity, gas, and water. PUCs ensure that these essential services are provided fairly, reliably, and at reasonable prices, often by overseeing monopolies and protecting consumers.

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.