Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

TRENDING TERM

Effective Load Carrying Capability (ELCC)

Measurement used to calculate how much an energy resource–such as a wind farm or solar array–contributes to the overall reliability of the grid. It assesses the resource’s ability to meet electricity demand, particularly during peak usage periods, and is especially useful for variable renewable energy sources whose output depends on factors like weather conditions. 

TRENDING TERM

Disturbance

Refers to any unwanted or unplanned electrical event that interferes with the normal operation of the electrical grid. These can manifest in power outages, surges, and other events, and can originate from various sources within the electrical grid, such as loss of a large generating unit or another grid asset, such as a transmission line or transformer.

Can’t find the term you’re looking for? Submit it here!

202(c) Order

An emergency order issued by the United States Department of Energy (DOE) under Section 202(c) of the Federal Power Act. It allows the Secretary of Energy to temporarily order connections of facilities and the generation, delivery, or transmission of electricity to best meet an emergency caused by war, a sudden increase in demand, or a shortage of energy or facilities. These temporary orders can also exempt power plants from federal, state, or local environmental rules and have historically been used to prevent outages during severe weather events or supply shortfalls.

Federal Energy Regulatory Commission (FERC)

An independent agency that regulates the interstate transmission of natural gas, oil, and electricity. FERC also regulates natural gas and hydropower projects.

Federal Power Act

A United States law primarily regulating the interstate transmission and sale of electricity and the development of hydroelectric power. It was responsible for creating the body now known as FERC. It was created in 1920 and has been amended several times since. 

Firming requirements

Measures taken to ensure backup power, particularly of renewable energy, such as solar and wind generators. These requirements may require battery storage, ancillary services, or backup generation, such as an added gas plant to produce energy when a solar or wind plant does not.

Frequency

Electricity is supplied to homes and businesses in the United States in the form of alternating current, and frequency is the rate at which an alternating current changes direction, as measured in hertz (Hz). Across the power grid there is a consistent frequency which in the United States is 60 Hz. 

Frequency regulation or response

The ability of the grid to react to a change in

the frequency to bring it back to the normal operating frequency, which is 60 Hz in the United States

  • Inertial response refers to the injection of stored energy, such as battery energy, into the electricity grid to slow down a decline in frequency. 
  • Primary frequency response – The first line of defense against frequency fluctuations that could destabilize the grid. It takes the form of immediate, automatic adjustments in power output by generators and loads in response to frequency deviations in the electric grid.
  • Fast frequency response consists of the combined inertial response and primary frequency response. It injects energy in the seconds immediately following a disturbance to slow frequency decline and establishes the minimum frequency (called the nadir).
  • Secondary frequency response works on a slightly longer time frame than primary frequency response, on the order of 5-15 minutes. It maintains grid frequency and allows for scheduled energy transfers between balancing authorities, which include utilities, regional transmission operators, and other grid management entities.
Reactive power

Power that does not perform useful work but is used to establish and maintain electromagnetic fields that are needed to generate, transmit, and convert electric power in the alternating current network. A shortage of reactive power can cause voltage to decline. (See also: voltage support)

Reliability

A characteristic of the whole electricity system to describe its ability to consistently deliver electricity to consumers without interruption, even through grid disturbances. Reliability comes down to having sufficient generating resources to meet demand and a functional operational grid system.

Reliability must-run (RMR) contract

An agreement initiated by an RTO or ISO with a power plant, keeping it in operation temporarily for reliability purposes.

Resilience

The ability of the grid to ride through extreme events, recover quickly, and support other critical systems (e.g., transportation, health care, public safety etc.).

Resource adequacy

An assessment of whether the current or projected resource mix is sufficient to meet capacity and energy needs for a particular grid. The resource mix includes all resources able to provide capacity and energy to the system. Adequacy assessments are used to identify potential shortfalls in the availability of resources across different time frames; from long-term planning (5 to 20+ years) to seasonal and day-ahead assessments.

RTO

 (see also: ISO) – A non-profit organization that manages the electricity transmission system in a specific region, ensuring reliable and efficient electricity delivery. RTOs operate the high-voltage electricity grid, facilitating the movement of power from generating plants to substations and ultimately to consumers. They also oversee competitive wholesale electricity markets.

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.