Grid Glossary

TRENDING TERM

Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

TRENDING TERM

Effective Load Carrying Capability (ELCC)

Measurement used to calculate how much an energy resource–such as a wind farm or solar array–contributes to the overall reliability of the grid. It assesses the resource’s ability to meet electricity demand, particularly during peak usage periods, and is especially useful for variable renewable energy sources whose output depends on factors like weather conditions. 

TRENDING TERM

Disturbance

Refers to any unwanted or unplanned electrical event that interferes with the normal operation of the electrical grid. These can manifest in power outages, surges, and other events, and can originate from various sources within the electrical grid, such as loss of a large generating unit or another grid asset, such as a transmission line or transformer.

Can’t find the term you’re looking for? Submit it here!

202(c) Order

An emergency order issued by the United States Department of Energy (DOE) under Section 202(c) of the Federal Power Act. It allows the Secretary of Energy to temporarily order connections of facilities and the generation, delivery, or transmission of electricity to best meet an emergency caused by war, a sudden increase in demand, or a shortage of energy or facilities. These temporary orders can also exempt power plants from federal, state, or local environmental rules and have historically been used to prevent outages during severe weather events or supply shortfalls.

CAISO

California ISO

Capacity

The maximum amount of power an energy source can physically produce (measured in megawatts/MW), or when referring to an electrical grid, the total amount of electricity that power plants connected to the grid are capable of producing. It’s essentially the total potential output of all the electricity sources, like coal, nuclear, hydro, wind, and solar plants. Meanwhile, energy is the actual output of a source over a particular time period. 

  • Capacity accreditation – The process by which grid operators determine the reliability contribution of individual power resources (such as power plants or energy storage systems) to the overall electricity grid. It quantifies how much a resource can reliably contribute to meeting demand, especially during peak times or periods of tight supply, guiding investment decisions for grid stability.
  • Capacity auction – A competitive market mechanism where grid operators or utilities purchase energy in the market from electricity generators (such as coal plants, wind, and solar farms) or demand-response participants for future energy needs. Essentially, the generators or demand-response entities provide their energy or technology for future periods of high demand. Capacity market auctions ensure enough electricity is available for future demand at the lowest achievable price for consumers. The goal is to balance reliability with cost by having market participants compete. There are two main types of auctions:
    • Forward capacity auctions: held years before the capacity is needed, giving operators time to upgrade or build facilities. 
    • Incremental auctions: take place closer to the delivery time, adjusting for changes in demand or unexpected generator issues.  

Generally, participants submit sealed bids to offer capacity at specific prices. The auction ends when the total capacity offered matches the region’s needs, and a single clearing price is set for all commitments.  

  • Capacity costs – The charges associated with ensuring a sufficient supply of power to meet peak demand. These charges cover the cost of maintaining and operating power plants, transmission infrastructure, and other components needed to meet the highest levels of electricity usage, essentially guaranteeing power is available when it’s most needed.
  • Capacity market – A type of wholesale market designed to ensure there will be enough power generation available in the future to meet peak demand and maintain grid reliability. Generators receive payments for promising to be available to produce electricity when needed, even if they aren’t running all the time. Functions sort of like an insurance policy, in that generators are paid for the promise to show up with power during times of high demand. This type of market is a method to maintain resource adequacy. Not all markets use this method (example: Electric Reliability Council of Texas (ERCOT).
Clean firm energy

An energy source that generates electricity with zero- or extremely low-carbon emissions, and can do so when needed, regardless of weather conditions. They include enhanced geothermal energy and advanced nuclear technologies. They also can include solar or wind paired with battery storage to provide on-demand power supply regardless of weather conditions or time of day. 

Connect and manage

Refers to a regulatory approach for connecting new power generators to the electrical grid, notably used in Texas (ERCOT). This approach allows new generators to connect expeditiously with minimal upfront transmission upgrades. However, the grid operator retains the right to curtail their output if transmission constraints arise. This contrasts with approaches where developers pay for upgrades prior to connection. (see Energy-only interconnection approaches)

Critical Issue Fast Path (CIFP)

An accelerated stakeholder process used in PJM Interconnection to resolve urgent, contentious, and time-sensitive issues that cannot be resolved through the normal stakeholder process. The process involves several stages of discussion and proposal development, culminating in a submission to the Federal Energy Regulatory Commission (FERC) for approval. The CIFP process has been used in recent years to discuss large load additions (2025) and resource adequacy (2023).

Peak demand

The brief periods when electricity consumption is at its highest, often driven by factors like extreme weather or heat events. This is the highest amount of electricity demand for which a grid operator needs to plan.

Peaker Plant

A power plant that is designed to quickly ramp up and provide electricity during periods of high energy demand, such as during hot summer afternoons or cold winter evenings, to meet the increased needs of households and businesses. These plants generally only run during these peak events to supplement regular power generation. 

Performance incentive mechanisms

A regulatory tool that ties a portion of utilities’ earnings to the utilities’ performance on desired regulatory outcomes, offering utilities opportunities to create the programs and services needed to advance emerging priorities.

Photovoltaic

The conversion of light into electricity at the junction of two substances exposed to light. A photovoltaic system employs solar modules, each comprising a number of solar cells, which generate electrical power.

PJM

Pennsylvania-New Jersey-Maryland Interconnection- services 13 states in Midatlantic and Midwest region

Power

The rate of transfer of energy. It’s essentially how quickly energy is being used or converted from one form to another in an electrical circuit. Power is measured in watts (W), which represents one joule (J) of energy per second.

Power Factor

A measure of how efficiently electrical power is being used. It shows how much of the total power flowing in a circuit is actually doing useful work (active power) versus being ”wasted” as reactive power. A power factor closer to 1 means higher efficiency and fewer losses.

PUC

Sometimes also called a Public Service Commission (PSC), is a state-level governmental agency that regulates utilities like electricity, gas, and water. PUCs ensure that these essential services are provided fairly, reliably, and at reasonable prices, often by overseeing monopolies and protecting consumers.

Queue

(see: Interconnection Queue)

Reactive power

Power that does not perform useful work but is used to establish and maintain electromagnetic fields that are needed to generate, transmit, and convert electric power in the alternating current network. A shortage of reactive power can cause voltage to decline. (See also: voltage support)

Reliability

A characteristic of the whole electricity system to describe its ability to consistently deliver electricity to consumers without interruption, even through grid disturbances. Reliability comes down to having sufficient generating resources to meet demand and a functional operational grid system.

Reliability must-run (RMR) contract

An agreement initiated by an RTO or ISO with a power plant, keeping it in operation temporarily for reliability purposes.

Resilience

The ability of the grid to ride through extreme events, recover quickly, and support other critical systems (e.g., transportation, health care, public safety etc.).

Resource adequacy

An assessment of whether the current or projected resource mix is sufficient to meet capacity and energy needs for a particular grid. The resource mix includes all resources able to provide capacity and energy to the system. Adequacy assessments are used to identify potential shortfalls in the availability of resources across different time frames; from long-term planning (5 to 20+ years) to seasonal and day-ahead assessments.

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.