An emergency order issued by the United States Department of Energy (DOE) under Section 202(c) of the Federal Power Act. It allows the Secretary of Energy to temporarily order connections of facilities and the generation, delivery, or transmission of electricity to best meet an emergency caused by war, a sudden increase in demand, or a shortage of energy or facilities. These temporary orders can also exempt power plants from federal, state, or local environmental rules and have historically been used to prevent outages during severe weather events or supply shortfalls.
Also known as real or true power, is the portion of electrical power that does useful work in a circuit, such as generating heat, light, or mechanical energy. (see related: reactive power)
A preliminary document used by government agencies to solicit public feedback on potential new rules or reforms before they are officially proposed. It outlines initial ideas, asks specific questions, and serves as the first step in a larger regulatory process. The acronym is frequently used by the Federal Energy Regulatory Commission (FERC). It precedes a formal Notice of Proposed Rulemaking (NOPR) and allows agencies to gauge public opinion and gather information to develop a more informed proposal.
(see also: Essential reliability services) – Supplementary services essential for maintaining the reliable operation and stability of the electrical grid beyond the basic generation and transmission of energy. They are “behind-the-scenes” services that include real-time balancing of electricity supply and demand, maintaining voltage levels, and providing the capability to restart the grid after a widespread outage (black start).
Is an automated system that continuously monitors the electrical network and adjusts the power output of multiple generators. Its primary functions are to maintain system frequency (60 Hz in United States), in response to changes in the power demand, or load.
Historically refers to industrial facilities with high electrical demand. They had long interconnection timelines that allowed for more study time under traditional planning processes. Currently, emerging large loads include cryptocurrency mining, data centers (conventional and artificial intelligence), oil field loads, and hydrogen production facilities. Many have a shorter timeline to interconnect (months vs. years) to the grid. In addition to these rapid timelines, some emerging large loads introduce new challenges to grid operators like rapid demand fluctuations and increased voltage sensitivity.
The amount of power or electricity consumed by a device or system at a given time. It’s the demand placed on an energy source, like a power grid or a battery, by the connected electrical equipment.
The increase in the demand for electricity over time. It signifies the rising need for power from various sectors, including residential, commercial, and industrial, and can be driven by factors like population increases, economic development, and the adoption of new technologies like electric vehicles and data centers.
A controlled process where a utility company reduces or shuts off power supply to certain areas or customers to balance demand with available supply, preventing a complete system failure. It’s a last-resort measure to maintain grid stability when demand exceeds supply or when there are issues with power generation or transmission.
A way for wholesale electric energy prices to reflect the value of electric energy at different locations, accounting for the patterns of load, generation, and the physical limits of the transmission system.
Analysis is typically performed on a system to determine the amount of capacity that needs to be installed to meet the desired reliability target, commonly expressed as an expected value, or LOLE of 0.1 days/year.
A non-profit organization that represents state public service commissions, which regulate essential utility services like energy, telecommunications, and water. Its stated aim is to improve the quality and effectiveness of public utility regulation. It has eight committees:
It also has a task force focused on Innovation.
Non-profit organization that operates to assure the effective and efficient reduction of risks to the reliability and security of the grid. It oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California. Its responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events and produces reports about the near and long-term reliability forecast.
A document used by government agencies to announce a potential new rule or amendment to an existing one. This is an official part of the law-making process, allowing public comment before the rule is finalized. The acronym is frequently used by the Federal Energy Regulatory Commission (FERC).
A government-owned, contractor-operated facility, funded and overseen by the United States Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE). It specializes in the research and development of renewable energy, energy efficiency, energy systems integration, and sustainable transportation.
New York ISO
(see: Interconnection Queue)