PJM

Pennsylvania-New Jersey-Maryland Interconnection- services 13 states in Midatlantic and Midwest region

Power

The rate of transfer of energy. It’s essentially how quickly energy is being used or converted from one form to another in an electrical circuit. Power is measured in watts (W), which represents one joule (J) of energy per second.

Power Factor

A measure of how efficiently electrical power is being used. It shows how much of the total power flowing in a circuit is actually doing useful work (active power) versus being ”wasted” as reactive power. A power factor closer to 1 means higher efficiency and fewer losses.

PUC

Sometimes also called a Public Service Commission (PSC), is a state-level governmental agency that regulates utilities like electricity, gas, and water. PUCs ensure that these essential services are provided fairly, reliably, and at reasonable prices, often by overseeing monopolies and protecting consumers.

Reactive power

Power that does not perform useful work but is used to establish and maintain electromagnetic fields that are needed to generate, transmit, and convert electric power in the alternating current network. A shortage of reactive power can cause voltage to decline. (See also: voltage support)

Reliability

A characteristic of the whole electricity system to describe its ability to consistently deliver electricity to consumers without interruption, even through grid disturbances. Reliability comes down to having sufficient generating resources to meet demand and a functional operational grid system.

Reliability must-run (RMR) contract

An agreement initiated by an RTO or ISO with a power plant, keeping it in operation temporarily for reliability purposes.

Resilience

The ability of the grid to ride through extreme events, recover quickly, and support other critical systems (e.g., transportation, health care, public safety etc.).

Resource adequacy

An assessment of whether the current or projected resource mix is sufficient to meet capacity and energy needs for a particular grid. The resource mix includes all resources able to provide capacity and energy to the system. Adequacy assessments are used to identify potential shortfalls in the availability of resources across different time frames; from long-term planning (5 to 20+ years) to seasonal and day-ahead assessments.

RTO

 (see also: ISO) – A non-profit organization that manages the electricity transmission system in a specific region, ensuring reliable and efficient electricity delivery. RTOs operate the high-voltage electricity grid, facilitating the movement of power from generating plants to substations and ultimately to consumers. They also oversee competitive wholesale electricity markets.

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.