Grid Glossary

Can’t find the term you’re looking for? Submit it here!

Firming requirements

Measures taken to ensure backup power, particularly of renewable energy, such as solar and wind generators. These requirements may require battery storage, ancillary services, or backup generation, such as an added gas plant to produce energy when a solar or wind plant does not.

Frequency

Electricity is supplied to homes and businesses in the United States in the form of alternating current, and frequency is the rate at which an alternating current changes direction, as measured in hertz (Hz). Across the power grid there is a consistent frequency which in the United States is 60 Hz. 

Frequency regulation or response

The ability of the grid to react to a change in

the frequency to bring it back to the normal operating frequency, which is 60 Hz in the United States

  • Inertial response refers to the injection of stored energy, such as battery energy, into the electricity grid to slow down a decline in frequency. 
  • Primary frequency response – The first line of defense against frequency fluctuations that could destabilize the grid. It takes the form of immediate, automatic adjustments in power output by generators and loads in response to frequency deviations in the electric grid.
  • Fast frequency response consists of the combined inertial response and primary frequency response. It injects energy in the seconds immediately following a disturbance to slow frequency decline and establishes the minimum frequency (called the nadir).
  • Secondary frequency response works on a slightly longer time frame than primary frequency response, on the order of 5-15 minutes. It maintains grid frequency and allows for scheduled energy transfers between balancing authorities, which include utilities, regional transmission operators, and other grid management entities.
National Association of Regulatory Utility Commissioners (NARUC)

A non-profit organization that represents state public service commissions, which regulate essential utility services like energy, telecommunications, and water. Its stated aim is to improve the quality and effectiveness of public utility regulation. It has eight committees:

  1. Consumer Affairs
  2. Critical Infrastructure
  3. Electricity
  4. Energy Resources & Environment
  5. Gas
  6. International Relations
  7. Telecommunications
  8. Water

It also has a task force focused on Innovation.

NERC

Non-profit organization that operates to assure the effective and efficient reduction of risks to the reliability and security of the grid. It oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California. Its responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events and produces reports about the near and long-term reliability forecast.

Notice of Proposed Rulemaking (NOPR)

A document used by government agencies to announce a potential new rule or amendment to an existing one. This is an official part of the law-making process, allowing public comment before the rule is finalized. The acronym is frequently used by the Federal Energy Regulatory Commission (FERC).

NREL

A government-owned, contractor-operated facility, funded and overseen by the United States Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE). It specializes in the research and development of renewable energy, energy efficiency, energy systems integration, and sustainable transportation.

NYISO

New York ISO

Glossary Form

Your Name(Required)

Contact Us

We’re glad you are here!
For any inquiries or to contact one of our experts please fill out our form.
This field is for validation purposes and should be left unchanged.
© 2025 All rights reserved The Reliable Grid Project.