Interconnection queue

The line in which power generation and transmission projects must wait after they have requested to connect to the electric grid. These queues are managed by grid operators like ISOs (Independent System Operators) or RTOs (Regional Transmission Organizations). Projects are evaluated for their impact on the grid and the necessary upgrades before they can connect and deliver electricity.